Projects
-
Athabasca Basin (14 Projects)
Clearwater West
View ProjectThe Clearwater West property was acquired by Fission Energy Corp. on December 18, 2012 and became part of the F3 Uranium Corp. portfolio as part of the Fission Uranium/Alpha Minerals agreement in December 2013. It comprises three contiguous claims... read more
Patterson Lake North
View ProjectA new uranium discovery was made on November 20, 2022 at the A1 conductor in hole PLN22-035. It is located approximately 25km NW of the Fission Uranium Corp Triple R deposit an Nexgen’s Arrow world class uranium deposits and in the south-western e... read more
Wales Lake
View Project: The Wales Lake Property comprises 28 claims covering 42,130 ha and is owned 100% by F3 Uranium Corp.. The property is located just west of Highway 955, outside the south-west margin of the Athabasca Basin approximately 20km southwest of Fission ... read more
Hobo Lake
View ProjectThe project consists of 42 non-contiguous mineral claims covering an area approx 50 kilometres long, totaling 24,985 ha and is 100% owned by F3 Uranium Corp.. The property was merged with the former Millson Lake and Karpinka Lake properties, also ... read more
Lazy Edward Bay
View ProjectThe Lazy Edward Bay Property comprises 11 mineral claims with an area of 1,827.9 ha. This property is located over shallow sandstone cover approximately 12.5 km east of the Cable Bay Shear Zone in the southeastern Athabasca Basin. The west ... read more
Bird Lake
View ProjectThe Bird Lake Property comprises 1 mineral claim with an area of 1,803 ha. This Property is located 13 km to the northeast of the McArthur River Uranium Mine. It overlies a northeast trending regional magnetic low that occurs within favo... read more
Seahorse Lake
View ProjectThe Seahorse Lake Property comprises 3 mineral claims with an area of 7,519 ha. This property is located over shallow sandstone cover along the highly prospective Wollaston-Mudjatik Transition Zone of the eastern Athabasca Basin. Historic dri... read more
Grey Island
View ProjectThe project consists of 11 mineral claims totaling 13,929 ha in the southeast area of the Athabasca Basin, and is 100% owned by F3 Uranium Corp.. It is located 70km northwest of the Key Lake mill and ... read more
Beaver River
View ProjectThe project consists of 21 mineral claims totaling 19,474 ha, and is 100% owned by F3 Uranium Corp. The property is underlain by the Beaverlodge Domain of the Rae Tectonic Province, just outside the northwest edge of the Paleoproterozoic Atha... read more
Midas
View ProjectThe Midas Property was merged with the Thompson Lake Property in late 2017, and consists of 14 non-contiguous claims totaling 8,896 ha covering an area approximately 10 km wide by 28 km long in a northeast-southwest orientation, located within two... read more
Hearty Bay
View ProjectThe Hearty Bay Property comprises 7 claims totaling 11,173 ha. F3 Uranium Corp. holds 100% ownership of the property. Three of the claims were acquired by staking in October 2017, and two in April 2019.
... read moreMurphy Lake
View ProjectThe Murphy Lake Property comprises 8 claims, within two claim blocks, totaling 609 hectares located within the eastern edge of the Athabasca Basin, Saskatchewan. Fission 3.0 holds 100% ownership of the property. All of the claims were acquired by ... read more
Cree Bay
View Project2015 drilling by Forum Uranium 14 km northeast of the property revealed dravite and sudoite clay alteration, quartz dissolution and remobilization, and sulphides deposited well up into the sandstone column overlying a major structural lineament (k... read more
Flowerdew Lake
View ProjectThe property consists of four contiguous claims totaling 5,667 hectares cover an area that is approximately 13km by 4km in size. The property is located along the regional geological trend to the nort... read more