Projects

PLN Project

View Project

The JR Zone was discovered by F3 Uranium during a fall 2022 drilling program on the PLN property with drill hole PLN22-035, which intersected off-scale radioactivity (>65,535 cps) associated with massive uraninite mineralization within the A1 m... read more

Broach

View Project

Broach is located directly south of the JR zone discovery. On January 22, 2024 F3 Uranium acquired the CanAlaska Uranium Ltd.'s Patterson West property (PW) through a Property Swap Agreement, and was immediately incorporated into the Broach Lake P... read more

Minto

View Project

Minto is located directly North of the JR zone discovery, 28km south of the Shea Creek deposit and 44km south of the historic Cluff Lake mine. This property consists of 23 mineral claims totaling 19,864 ha. The property is located along Highway 95... read more

Clearwater West

View Project

The Clearwater West property was acquired by Fission Energy Corp. on December 18, 2012 and became part of the F3 Uranium Corp. portfolio as part of the Fission Uranium/Alpha Minerals agreement in December 2013. It comprises three contiguous claims... read more

Wales Lake East

View Project

The Wales Lake East Property comprises 11 claims covering 13,256 ha. The property is located just west of Highway 955, outside the south-west margin of the Athabasca Basin approximately 25km southwest of Fission Uranium's flagship Triple R uranium... read more

Wales Lake West

View Project

The Wales Lake West Property comprises 20 claims covering 28,878 ha. The property is located just west of Highway 955, outside the south-west margin of the Athabasca Basin approximately 23km southwest of Fission Uranium's flagship Triple R uranium... read more

Todd

View Project

The Todd Property consists of four mineral claims covering 9,704 hectares. The property is located 500m southwest of Highway 955 and sits just outside the southwest margin of the Athabasca Basin. The property straddles the boundary of the basement... read more

Smart Lake

View Project

The Smart Lake Project consists of 3 mineral claims covering 1870 hectares. The property is located 27km west of Highway 955 and sits just inside the southwest margin of the Athabasca Basin.

... read more

James Creek

View Project

The James Creek Property comprises 2 claims covering 1,089 ha. The property is located just East of Highway 955, approximately 20km east of the Shea Creek Project uranium deposits within the south-west Athabasca Basin. The model of mineraliza... read more

Lazy Edward Bay

View Project

The Lazy Edward Bay Property comprises 11 mineral claims with an area of 1,827.9 ha.  This property is located over shallow sandstone cover approximately 12.5 km east of the Cable Bay Shear Zone in the southeastern Athabasca Basin.  The west ... read more

Grey Island

View Project

The project consists of 22 mineral claims totaling 47,912 ha in the southeast area of the Athabasca Basin, and is 100% owned by F3 Uranium Corp. It is located 70km northwest of the Key Lake mill and a... read more

Seahorse Lake

View Project

The Seahorse Lake Property comprises 3 mineral claims with an area of 7,519 ha. This property is located over shallow sandstone cover along the highly prospective Wollaston-Mudjatik Transition Zone of the eastern Athabasca Basin. Historic dri... read more

Bird Lake

View Project

The Bird Lake Property comprises 1 mineral claim with an area of 1,803 ha. This Property is located 13 km to the northeast of the McArthur River Uranium Mine. It overlies a northeast trending regional magnetic low that occurs within favo... read more

Henderson Lake

View Project

The Henderson Lake Property comprises 1 claim covering 1,427 ha.

... read more

Beaver River

View Project

The project consists of 9 mineral claims totaling 7,599 ha, and is 100% owned by F3 Uranium Corp. The property is underlain by the Beaverlodge Domain of the Rae Tectonic Province, just outside the northwest edge of the Paleoproterozoic Athabasca B... read more

Hearty Bay

View Project

The Hearty Bay Property comprises 7 claims totaling 11,173 ha. F3 Uranium Corp. holds 100% ownership of the property. Three of the claims were acquired by staking in October 2017, and two in April 2019.

... read more

Cree Bay

View Project

2015 drilling by Forum Uranium 14 km northeast of the property revealed dravite and sudoite clay alteration, quartz dissolution and remobilization, and sulphides deposited well up into the sandstone column overlying a major structural lineament (k... read more

Murphy Lake

View Project

The Murphy Lake Property comprises 8 claims, within two claim blocks, totaling 609 hectares located within the eastern edge of the Athabasca Basin, Saskatchewan. F3 Uranium Corp. holds 100% ownership of the property. All of the claims were acquire... read more

Bell Lake

The project consists of 1 mineral claim totaling 2,225 ha, and is 100% owned by F3 Uranium Corp

...

Flowerdew Lake

View Project

The property consists of four contiguous claims totaling 5,667 hectares cover an area that is approximately 13km by 4km in size. The property is located along the regional geological trend to the nort... read more

PLN JR Zone

View Discovery

The JR Zone was discovered by F3 Uranium during a fall 2022 drilling program on the PLN property with drill hole PLN22-035, which intersected off-scale radioactivity (>65,535 cps) associated with massive uraninite mineralization within the A1 m... read more

Subscribe to Investor Updates



©2024
All rights reserved.
Disclaimer